Descriptions:
Water cooling system integrated with cooling tower, circle pumps station and control cabinet, that is convenience for installation. This cooling system can be used for induction machine from 100kW to 1000kW and can be installed indoor and outdoor.
Closed circuit cooling towers, also known as evaporative fluid coolers, keep the system clean and contaminant-free in a closed loop. This creates two separate fluid circuits: (1) an external circuit, in which spray water circulates over the coil and mixes with the outside air, and (2) an internal circuit, in which the process fluid to be cooled circulates inside the coil. During operation, heat is transferred from the warm fluid in the coil to the spray water, and then to the atmosphere as a portion of the water evaporates. In addition to chiller applications and industrial process cooling, closed circuit cooling towers are often used with heat pump systems, where closed loop cooling is required.
Range of application: 80kW-1000kW
Cooling Capacity: 10T-150T
1. DI Water cooled with tap water
2. Adapt to wide range of induction equipment
3. Low maintenance required
4. Stainless steel tank minimizes electrolysis and clogging
Get your water cooling solution for induction heating, please contact us.
1. How to choose the induction heating machine?
Please tell us with the dimensions and heating area of workpiece, heating temperature and heating time, as well as any specific requirement of heating process, our experience sales will recommend the appropriate induction heating equipment.
2. Can we see the heating test before purchase induction heater?
Customs can send the workpiece to us for heating testing in our laboratory, and decide whether purchase HCGP induction machine after received the heating testing video and report.
3. How about the service of installation and commission?
The details manual and guide for installation and commission with picture and video will be sent to our customers. Most of our customers can complete installation and commission on their own follow our instructions. We still provide paid on-site installation service.
4. The operation manual provides work standards for regular maintenance and guidance for dealing common fault. we also help you manage your spare parts inventory.
5. How can customer get service when the machine get problem?
We provide 7x24h online technical support and repair service as well as on-site service.
6. Can you provide repair parts for a long time?
はい, we will help our customer manage their spare parts inventory.
7. Can you help us design coil for our new produces?
We offer different coil service:
- Coil design with pre-purchase heating testing
- Coil design for different heating workpieces when purchasing induction equipment
- Coil design for customers when they developing new products
- Guide customers to make coils on their own